More D Report post Posted September 29, 2016 My contractor who did my bathroom remodeling backed out on the installation of the master shower door. Everything is done except this shower door. Does anyone here do this type or work? I am pretty handy but this one is over my head. PM if you prefer Thanks Share this post Link to post Share on other sites
sherman Report post Posted September 29, 2016 How soon do you need it done? I installed them for about a year ago few years ago. Just because of the drive is will have to make if no one can help pm me and we will work something out Share this post Link to post Share on other sites
muledeerarea33? Report post Posted September 29, 2016 If your in Tucson contact 25-06 from here. He does that stuff for a living and is good at it. Share this post Link to post Share on other sites
More D Report post Posted September 29, 2016 I'm not in a hurry but Mama wants her shower. The 6 day jod turned into 15 days. I'll PM every one. . I am in Tucson. Thanks for the help! Share this post Link to post Share on other sites
firstcoueswas80 Report post Posted September 29, 2016 I'm not in a hurry but Mama wants her shower. The 6 day jod turned into 15 days. I'll PM every one. . I am in Tucson. Thanks for the help! Hose in the backyard. No doors, just freedom! 1 Share this post Link to post Share on other sites