trophymaster Report post Posted March 28, 2011 Saturday April 2nd Let's try and get there around 8:30AM 1.) We will finish removing all the fences. I will have a big supply of fence tools and work gloves. I will have a quad with a wire roller machine. There are 4 sites 3 just need rolled (some with the machine, some by hand) the 4th fence is completely standing so wires need to be cut, posts pulled, wire rolled, and everything carried out to a road. I will try to line up another couple employees with quads or rangers. But it would be good if a few volunteers could bring rangers or ATVs to help haul fencing out of the forest. The attachment lists the remaining fence work. 2.) The second job will be gathering and piling up loose junk from around and inside the old buildings. The stuff does not need to be sorted, just piled somewhere that heavy equipment and a dump truck can easily get to it. Hopefully it will be too cold for snakes, but we will definitely have to warn folks to be cautious. If you need more info please e-mail me: hchllc@yahoo.com Thanks, Share this post Link to post Share on other sites